Key Factors When Installing PDUs in a Data Centre

Deploying PDUs within a data centre requires careful planning. Facilities teams should review equipment demand, rack layout, and electrical supply before installation starts. Effective planning supports safe power distribution and minimises the risk of overload.



Evaluating Total Power Requirements



The first step is assessing total power requirements. Each device within the rack draws a specific amount of current. Technicians should determine the combined load to ensure the selected PDU can handle connected equipment. Installing a unit with insufficient capacity may result in circuit failure.



Choosing the Right Rack Configuration



Rack configuration significantly affects PDU selection. Vertical PDUs provide multiple outlets without occupying equipment mounting space and are often positioned along the rear of the cabinet. Horizontal PDUs fit within rack units and are used where vertical space is restricted.



Input Power Type & Load Balancing



Input power type should be considered. Some PDUs are designed for single-phase supply, while others support three-phase input. Three-phase PDUs enable power to be distributed across separate circuits, which assists in balancing electrical load.



Outlet Compatibility



Outlet type should match equipment plug requirements. Data centres often use a mix of C13 and C19 connectors depending on device demand. Choosing suitable outlet types ensures compatibility with connected hardware.



Organised Cable Management



Cable management is another key factor. PDUs should be mounted in a way that supports organised routing of power leads. Clear routing minimises airflow obstruction and improves cooling efficiency.



Monitoring and Visibility



Monitoring features may also influence selection. Metered or intelligent PDUs enable facilities teams to track electrical usage. This visibility helps identifying underused capacity and aids future expansion planning.



Redundancy and Business Continuity



Redundancy planning is essential in facilities that require continuous operation. Automatic transfer switch PDUs allow equipment to remain powered if the primary supply fails. Backup systems maintain business continuity during electrical interruptions.



After-Installation Checks



Routine inspection should follow installation. Technicians should confirm secure mounting and inspect input connections. Ongoing testing maintains electrical safety across the data centre.



PDUs support reliable power distribution across IT infrastructure. Careful installation safeguards equipment and maintains operational stability within data centre environments.